woolcrossingtrafficsimulationpart5 [2018/01/29 13:11] – [Simulation With extra 1000 Homes] markwoolcrossingtrafficsimulationpart5 [2018/01/29 13:58] (current) – [Conclusion] mark
Line 67: Line 67:
 The previous simulation shows the current situation in Wool. The next stage is to show how the extra 800 homes will affect the traffic flows.  The previous simulation shows the current situation in Wool. The next stage is to show how the extra 800 homes will affect the traffic flows. 
  
-The “Potential Traffic Impacts of Development in the Wool Area” (Referred to as PTI see Note2) provides the TRICS (Trip Rate Information Computer System) estimated trip rate for an extra 1000 homes where the Vehicles are leaving at 8am. This is given as 346 over the hour. We can scale this value to give us the vehicle-per-hour for 800 houses. The result is 276.8 (rounded to 279).+The “Potential Traffic Impacts of Development in the Wool Area” (Referred to as PTI see Note2) provides the TRICS (Trip Rate Information Computer System) estimated trip rate for an extra 1000 homes where the Vehicles are leaving at 8am. This is given as 346 over the hour. We can scale this value to give us the vehicle-per-hour for 800 houses. The result is 276.8 (rounded to 277).
  
-The PTI uses a split of 55:45 split for West and East bound traffic. For this simulation the East/West split measured at Station Garage at 8am was used. It has also been assumed that the 1000 homes will not generate any extra HGV traffic.+The PTI uses a split of 55:45 split for West and East bound traffic. For this simulation the East/West split measured at Station Garage at 8am was used. It has also been assumed that the 277 homes will not generate any extra HGV traffic.
  
  
 ^ Direction ^ Cars ^ % Total Cars ^ Est Cars Leaving new development ^ ^ Direction ^ Cars ^ % Total Cars ^ Est Cars Leaving new development ^
-|W |500 |49.12%| 170 +|W |500 |49.12%| 136 
-|E |518 |50.88%| 176 |+|E |518 |50.88%| 141 |
  
  
-From the data above, the extra 1000 homes will generate 176 cars between 8am and 9am heading east (towards Wareham). The other 170 vehicles have been ignored because they are heading away from the crossing.+From the data above, the extra 800 homes will generate 141 cars between 8am and 9am heading east (towards Wareham). The other 136 vehicles have been ignored because they are heading away from the crossing.
  
 This following video shows the simulation output. This following video shows the simulation output.
  
- +{{youtube>ZqmO7l5uWuA|Simulation With Extra 800 Houses}}
-{{youtube>WQUev9N0Wnw|Simulation With Extra 1000 Houses}}+
  
  
Line 93: Line 92:
 ====== Conclusion ====== ====== Conclusion ======
  
-The Videos show that without the extra homes, the queue goes back as far as Linclieth Road. Adding the vehicles generated by the extra 1000 homes makes the queue go past Bailey's Drove. +The Videos show that without the extra homes, the queue goes back as far as Linclieth Road. Adding the vehicles generated by the extra 800 homes makes the queue go almost up to Bailey's Drove. 
  
-{{:screenshot_2016-11-29_20-09-07.png?500|}}+{{::screenshot_2018-01-29_13-51-16.png?600|}}
  
-This distance is about 300m.+This distance is about 228m.
  
-The original "Potential Traffic Impacts of Development in the Wool Area” (Note2) assessment predicted a maximum queue length of 82m (514m-432m, page 17, table 8.1). The simulations above show that the queue length from the extra 1000 homes is closer to 300m.+The original "Potential Traffic Impacts of Development in the Wool Area” (Note2) assessment predicted a maximum queue length of 82m (514m-432m, page 17, table 8.1). The simulations above show that the queue length from the extra 800 homes is closer to 228m.
  
 The simulation does not take into account traffic coming from Lulworth into Wool past the Spar Shop. In previous [[woolcrossingtrafficsimulation|simulations]] adding this data shows that the traffic junction by the Station will become congested and a major traffic bottleneck.  The simulation does not take into account traffic coming from Lulworth into Wool past the Spar Shop. In previous [[woolcrossingtrafficsimulation|simulations]] adding this data shows that the traffic junction by the Station will become congested and a major traffic bottleneck. 