User Tools

Site Tools


woolcrossingtrafficsimulationpart5

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Last revisionBoth sides next revision
woolcrossingtrafficsimulationpart5 [2018/01/29 13:53] – [Conclusion] markwoolcrossingtrafficsimulationpart5 [2018/01/29 13:57] – [Conclusion] mark
Line 96: Line 96:
 {{::screenshot_2018-01-29_13-51-16.png?600|}} {{::screenshot_2018-01-29_13-51-16.png?600|}}
  
-This distance is about 228m TODO.+This distance is about 228m.
  
 The original "Potential Traffic Impacts of Development in the Wool Area” (Note2) assessment predicted a maximum queue length of 82m (514m-432m, page 17, table 8.1). The simulations above show that the queue length from the extra 800 homes is closer to 228m. The original "Potential Traffic Impacts of Development in the Wool Area” (Note2) assessment predicted a maximum queue length of 82m (514m-432m, page 17, table 8.1). The simulations above show that the queue length from the extra 800 homes is closer to 228m.
woolcrossingtrafficsimulationpart5.txt · Last modified: 2018/01/29 13:58 by mark