====== Conclusion ====== | ====== Conclusion ====== | ||
- | The Videos show that without the extra homes, the queue goes back as far at the Central Convenience Stores. Adding the extra vehicles caused by the 1000 homes makes the queue go past the current Purbeck Gate entrance and up towards the Winfrith Roundabout. | + | The Videos show that without the extra homes, the queue goes back as far at the Central Convenience Stores. Adding the extra vehicles caused by the 1000 homes makes the queue go past the current Purbeck Gate entrance and up towards the Winfrith Roundabout. This distance is about 600m or 0.4 miles. |
- | After the crossing opens, the tail back takes | + | The original " |
The simulation does not take into account traffic coming from Lulworth into Wool past the Spar Shop. In previous [[woolcrossingtrafficsimulation|simulations]] adding this data shows that the traffic junction by the Station will become congested and a major traffic bottleneck. | The simulation does not take into account traffic coming from Lulworth into Wool past the Spar Shop. In previous [[woolcrossingtrafficsimulation|simulations]] adding this data shows that the traffic junction by the Station will become congested and a major traffic bottleneck. | ||