User Tools

Site Tools


woolcrossingtrafficsimulationpart2

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
woolcrossingtrafficsimulationpart2 [2016/07/15 09:54] – [Scenario 1] markwoolcrossingtrafficsimulationpart2 [2016/07/18 12:50] (current) – [Scenario 1] mark
Line 3: Line 3:
 The last set of simulations (see [[WoolCrossingTrafficSimulation|Wool Traffic Simulation]] for more background information) only used existing measurements to generate the model.  The last set of simulations (see [[WoolCrossingTrafficSimulation|Wool Traffic Simulation]] for more background information) only used existing measurements to generate the model. 
  
-The Department for Transport statistics produces forecasts for the estimated number of vehicles over the next 25 years. This data is available from the following location:+The Department for Transport produces forecasts for the estimated number of vehicles over the next 25 years. This data is available from the following location:
  
 https://www.gov.uk/government/statistical-data-sets/tra99-forecasts-of-traffic https://www.gov.uk/government/statistical-data-sets/tra99-forecasts-of-traffic
Line 24: Line 24:
  
 {{youtube>Pgp69ZzEC98|SimWithEstimatedVehicle1000HomeS1Forecast}} {{youtube>Pgp69ZzEC98|SimWithEstimatedVehicle1000HomeS1Forecast}}
 +
 +\\ 
 +
 +The simulation above was created using flow data from:
 +
 +^ Location      ^ Date   ^
 +| From Lulworth      | 2009/09/14 |
 +| From Wareham       | 2007/04/24 |
 +| From Dorchester    | 2008/07/11 |    
 +
 +The Video shows the queue goes beyond the Dorset Green roundabout. 
 +
 +
 +====== TODO ======
 +
 +   * Perform the simulation on Scenario 2 to 5
  
  
  
  
woolcrossingtrafficsimulationpart2.1468576465.txt.gz · Last modified: 2016/07/15 09:54 by mark