 The last set of simulations (see [[WoolCrossingTrafficSimulation|Wool Traffic Simulation]] for more background information) only used existing measurements to generate the model.  The last set of simulations (see [[WoolCrossingTrafficSimulation|Wool Traffic Simulation]] for more background information) only used existing measurements to generate the model. 
  
-The Department for Transport statistics produces forecasts for the estimated number of vehicles over the next 25 years. This data is available from the following location:+The Department for Transport produces forecasts for the estimated number of vehicles over the next 25 years. This data is available from the following location:
  
 https://www.gov.uk/government/statistical-data-sets/tra99-forecasts-of-traffic https://www.gov.uk/government/statistical-data-sets/tra99-forecasts-of-traffic
Line 21: Line 21:
 ====== Scenario 1 ====== ====== Scenario 1 ======
  
-The following video shows the simulation at the first time the cross goes down with the extra vehicles using the Department for Transport forecast statistics for Scenario 1.+The following video shows the simulation at the first time the cross goes down (~8:15am) with the extra vehicles using the Department for Transport forecast statistics for Scenario 1.
  
 {{youtube>Pgp69ZzEC98|SimWithEstimatedVehicle1000HomeS1Forecast}} {{youtube>Pgp69ZzEC98|SimWithEstimatedVehicle1000HomeS1Forecast}}
 +
 +\\ 
 +
 +The simulation above was created using flow data from:
 +
 +^ Location      ^ Date   ^
 +| From Lulworth      | 2009/09/14 |
 +| From Wareham       | 2007/04/24 |
 +| From Dorchester    | 2008/07/11 |    
 +
 +The Video shows the queue goes beyond the Dorset Green roundabout. 
 +
 +
 +====== TODO ======
 +
 +   * Perform the simulation on Scenario 2 to 5
  
  
  
  