woolcrossingtrafficsimulationpart2
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
woolcrossingtrafficsimulationpart2 [2016/07/15 08:35] – mark | woolcrossingtrafficsimulationpart2 [2016/07/18 12:50] (current) – [Scenario 1] mark | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Wool Traffic Simulation - Part 2 ====== | ====== Wool Traffic Simulation - Part 2 ====== | ||
- | The last simulations only used existing measurements to generate the model. The Department for Transport | + | The last set of simulations |
+ | |||
+ | The Department for Transport produces forecasts for the estimated number of vehicles | ||
https:// | https:// | ||
Line 17: | Line 19: | ||
+ | ====== Scenario 1 ====== | ||
+ | |||
+ | The following video shows the simulation at the first time the cross goes down (~8:15am) with the extra vehicles using the Department for Transport forecast statistics for Scenario 1. | ||
+ | |||
+ | {{youtube> | ||
+ | |||
+ | \\ | ||
+ | |||
+ | The simulation above was created using flow data from: | ||
+ | |||
+ | ^ Location | ||
+ | | From Lulworth | ||
+ | | From Wareham | ||
+ | | From Dorchester | ||
+ | |||
+ | The Video shows the queue goes beyond the Dorset Green roundabout. | ||
+ | |||
+ | |||
+ | ====== TODO ====== | ||
+ | |||
+ | * Perform the simulation on Scenario 2 to 5 | ||
woolcrossingtrafficsimulationpart2.1468571727.txt.gz · Last modified: 2016/07/15 08:35 by mark