woolcrossingtrafficsimulationpart2 [2016/07/15 07:10] – created markwoolcrossingtrafficsimulationpart2 [2016/07/18 12:50] (current) – [Scenario 1] mark
Line 1: Line 1:
 ====== Wool Traffic Simulation - Part 2 ====== ====== Wool Traffic Simulation - Part 2 ======
  
-The last sim+The last set of simulations (see [[WoolCrossingTrafficSimulation|Wool Traffic Simulation]] for more background information) only used existing measurements to generate the model.  
 + 
 +The Department for Transport produces forecasts for the estimated number of vehicles over the next 25 years. This data is available from the following location:
  
 https://www.gov.uk/government/statistical-data-sets/tra99-forecasts-of-traffic https://www.gov.uk/government/statistical-data-sets/tra99-forecasts-of-traffic
 +
 +The following table shows the Forecasts of road traffic in England and the increase from the estimated 2015 level. 
 +
 +^ Scenario ^ 2015  ^ 2030 ^ % Increase  ^
 +| Scenario 1 | 106 | 130  | 22.80% |
 +| Scenario 2 | 105 | 125  | 18.38% |
 +| Scenario 3 | 103 | 115  | 12.01% |
 +| Scenario 4 | 103 | 119  | 15.50% |
 +| Scenario 5 | 110 | 141  | 28.74% |
 +
 +More infomation on the different Scenarios can be found in the {{https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/411471/road-traffic-forecasts-2015.pdf|Road Traffic Forecasts 2015}}
 +
 +
 +====== Scenario 1 ======
 +
 +The following video shows the simulation at the first time the cross goes down (~8:15am) with the extra vehicles using the Department for Transport forecast statistics for Scenario 1.
 +
 +{{youtube>Pgp69ZzEC98|SimWithEstimatedVehicle1000HomeS1Forecast}}
 +
 +\\ 
 +
 +The simulation above was created using flow data from:
 +
 +^ Location      ^ Date   ^
 +| From Lulworth      | 2009/09/14 |
 +| From Wareham       | 2007/04/24 |
 +| From Dorchester    | 2008/07/11 |    
 +
 +The Video shows the queue goes beyond the Dorset Green roundabout. 
 +
 +
 +====== TODO ======
 +
 +   * Perform the simulation on Scenario 2 to 5
 +
  
  
-`2015 `2020 `2025 `2030 ` 
-| 106 | 115 | 124 | 130 |  
-| 105 | 113 | 120 | 125 |  
-| 103 | 108 | 113 | 115 |  
-| 103 | 108 | 115 | 119 |  
-| 110 | 122 | 133 | 141 |  
  