woolcrossingtrafficsimulationpart2
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
woolcrossingtrafficsimulationpart2 [2016/07/15 09:53] – [Scenario 1] mark | woolcrossingtrafficsimulationpart2 [2016/07/15 09:59] – mark | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Wool Traffic Simulation - Part 2 ====== | ====== Wool Traffic Simulation - Part 2 ====== | ||
- | The last simulations only used existing measurements to generate the model. The Department for Transport | + | The last set of simulations |
+ | |||
+ | The Department for Transport produces forecasts for the estimated number of vehicles | ||
https:// | https:// | ||
Line 19: | Line 21: | ||
====== Scenario 1 ====== | ====== Scenario 1 ====== | ||
- | The following video shows the simulation at the first time the cross goes down with the extra vehicles using the Department for Transport forecast statistics for Scenario 1. | + | The following video shows the simulation at the first time the cross goes down (~8: |
{{youtube> | {{youtube> | ||
+ | |||
+ | |||
+ | |||
+ | ====== TODO ====== | ||
+ | |||
+ | * Perform the simulation on Scenario 2 to 5 | ||
woolcrossingtrafficsimulationpart2.txt · Last modified: 2016/07/18 12:50 by mark