woolcrossingtrafficsimulationpart2
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
woolcrossingtrafficsimulationpart2 [2016/07/15 09:53] – [Scenario 1] mark | woolcrossingtrafficsimulationpart2 [2016/07/15 09:54] – [Scenario 1] mark | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Wool Traffic Simulation - Part 2 ====== | ====== Wool Traffic Simulation - Part 2 ====== | ||
- | The last simulations only used existing measurements to generate the model. The Department for Transport statistics produces forecasts for the estimated number of vehicles. This data is available from the following location: | + | The last set of simulations |
+ | |||
+ | The Department for Transport statistics produces forecasts for the estimated number of vehicles | ||
https:// | https:// | ||
Line 19: | Line 21: | ||
====== Scenario 1 ====== | ====== Scenario 1 ====== | ||
- | The following video shows the simulation at the first time the cross goes down with the extra vehicles using the Department for Transport forecast statistics for Scenario 1. | + | The following video shows the simulation at the first time the cross goes down (~8: |
{{youtube> | {{youtube> |
woolcrossingtrafficsimulationpart2.txt · Last modified: 2016/07/18 12:50 by mark