 +The PTI Automatic Traffic Count data from the PTI report is from 2014-03-01 to 2014-03-25.
  
 The Crossing down times has been gained from the  Open Rail Data (Note3), this provides detailed information of train locations heading towards and away from the Wool Crossing. Using this information it is possible to generate an estimated crossing down times and lengths. This information was programmed into the simulation for the time between 8am and 9am: The Crossing down times has been gained from the  Open Rail Data (Note3), this provides detailed information of train locations heading towards and away from the Wool Crossing. Using this information it is possible to generate an estimated crossing down times and lengths. This information was programmed into the simulation for the time between 8am and 9am:
Line 90: Line 92:
  
 \\  \\ 
 +
 +The simulation above was created using flow data from:
 +
 +^ Location      ^ Date   ^
 +| From Lulworth      | 2009/09/14 |
 +| From Wareham       | 2007/04/24 |
 +| From Dorchester    | 2008/07/11 |    
  
 This simulation has the following Limitations: This simulation has the following Limitations: