woolcrossingtrafficsimulation [2016/07/13 07:03] markwoolcrossingtrafficsimulation [2016/07/13 14:11] – [Initial Simulation] mark
Line 20: Line 20:
  
 \\  \\ 
 +
 +The PTI Automatic Traffic Count data from the PTI report is from 2014-03-01 to 2014-03-25.
  
 The Crossing down times has been gained from the  Open Rail Data (Note3), this provides detailed information of train locations heading towards and away from the Wool Crossing. Using this information it is possible to generate an estimated crossing down times and lengths. This information was programmed into the simulation for the time between 8am and 9am: The Crossing down times has been gained from the  Open Rail Data (Note3), this provides detailed information of train locations heading towards and away from the Wool Crossing. Using this information it is possible to generate an estimated crossing down times and lengths. This information was programmed into the simulation for the time between 8am and 9am:
woolcrossingtrafficsimulation.txt · Last modified: 2016/07/13 14:27 by mark